PART 2: CX-Server PLC Tools
CHAPTER 4 – PLC Setup Component
OMRON
CX-Server PLC Tools_Page 28
♦
Monitor
- Select this to start monitoring the running program when the PLC is powered on.
♦
Run
- Select this to run the PLC’s program when the PLC is powered on.
♦
Use Programming Console
- This is the default setting that allows you to select the operating mode when
online.
In addition to the above, the following settings are available for CJ1-H and CS1-H PLCs
Execution Settings
For the CJ1-H and CS1-H PLCs series PLCs set the
Execution Setting
options as appropriate.
1, 2, 3…
1.
Run program when initialize unit/board
. Check the tick box to select this option.
2.
Service for units when Inner Board recognition
. Check the tick box to select this option.
Settings
The
Settings
tab of the PLC Setup component allows execution processes and controls to be defined and EM
allocation to be enabled.
Note:
For CS1-H and CJ1-H PLCs only, this tab is called CPU Settings
Execute Process
Use the following procedure to apply Execute Process settings.
1, 2, 3…
1.
Low Battery Enabled -
Select (tick) this option to flag when CPU Unit battery errors are
detected.
2.
Interrupt Task Enabled -
When this option is selected interrupt task errors will be
detected.
3. Stop CPU Error Enabled
- Select this option to determine if instruction errors (instruction
processing errors (ER) and illegal access errors (AER)) are to treated as non-fatal or fatal
errors.
4.
Don't register FAL to error log
- Select this option (tick) to stop registering FAL to
error log.
Memory Allocation
CS1-series PLCs can select either Memory Card or EM (Expansion Memory) specified file area. Each time
EM is selected, the EM is reformatted automatically.
To use EM rather than Memory Card, select the
EM File Setting enabled
setting and enter the
EM Start File No
.
CS1-series PLCs can use EM as file memory, either as or as well as Compact Flash disk. When transferred to
the PLC, EM is formatted.
In addition to the above, the following settings are also available for CJ1-H and CS1-H PLCs
Background Execution
1, 2, 3…
1.
Table data process instructions
. Check the tick box enable Table date process
instructions.
2. String data process instructions
- Select (tick) this option to enable String data process
instructions.
3. Data shift process instructions
- Select (tick) this option to enable Data shift process
instructions.
4. Com port number
- Enter a number between 1 and 7 inclusive, to set the Com port you
wish to connect by.
Caution: Entering a com port number higher than the number of ports actually available
will prevent future connections to that PLC.
Timings
The
PLC Timings
tab of the PLC Setup component allows cycle, interrupt and event timings to be defined. Use
the following procedure when applying settings in the
PLC Timings
tab for standard CS1 PLCs. When setting
the timings for other PLC types follow the on-screen instructions.
Содержание Sysmac WS02-CXPC1-EV3
Страница 1: ...Cat No W414 E1 01 SYSMAC...
Страница 2: ......
Страница 3: ...SYSMAC WS02 CXPC1 EV3 CX Programmer Ver 3 1 Operation Manual Revised November 2002...
Страница 4: ......
Страница 6: ......
Страница 7: ...PART1 CX Programmer...
Страница 8: ......
Страница 24: ......
Страница 34: ......
Страница 106: ......
Страница 130: ......
Страница 131: ...PART 2 CX Server PLC Tools...
Страница 132: ......
Страница 136: ......
Страница 158: ......
Страница 168: ......
Страница 194: ......
Страница 206: ......
Страница 250: ......
Страница 298: ......
Страница 304: ......
Страница 305: ...PART 3 CX Server Runtime...
Страница 306: ......
Страница 310: ......
Страница 338: ......
Страница 344: ......
Страница 378: ......
Страница 384: ......
Страница 388: ......
Страница 390: ...Cat No W414 E1 01 Note Specifications subject to change without notice Printed in Japan Authorized Distributor...