
7
M
eth
od
s
fo
rC
on
ne
ctin
g
an
d
C
om
m
un
ica
tin
g
w
ith
E
xte
rn
al
D
ev
ice
s
554
Controlling/Outputting through Parallel Communication
FZ4 User's Manual
BUSY
Indicates that the controller is currently switching the scene or scene group. Do not input next
command while the BUSY signal is on. Otherwise, on-going processing or commands that are input
will not be performed correctly.
Input signal Scene switching
Signal
Function
DI0 to 4
Set scene No. (0 to 31).
When a DI terminal offset is set, the setting value is added.
DI5
ON
DI6
OFF
DI7
This is the execution trigger.
After DI0 to 6 is set, turn DI7 on after an interval over 1 ms.
BUSY signal is on during implementation of commands. If the DI7 signal OFF timing cannot be set
faster than the BUSY signal OFF timing on the control side, set the scene switching additional time
to lengthen the BUSY signal OFF timing.
Reference
●
The amount of time during which the BUSY signal is turned ON when a scene is switched can be changed.
[Measurement setting] in the [Measure] menu Setting conditions related to operation during measurement
Input signal Scene group switching
Signal
Function
DI0 to 4
Set scene group No. (0 to 31).
When a DI terminal offset is set, the setting value is added.
DI5
ON
DI6
ON
DI7
This is the execution trigger.
After DI0 to 6 is set, turn DI7 on after an interval over 1 ms.
BUSY signal is on during implementation of commands. After checking that the BUSY signal has
turned on, turn DI7 off, and then turn DI0 to 6 off. If the DI7 signal OFF timing cannot be set faster
than the BUSY signal OFF timing on the control side, set the scene switching additional time to
lengthen the BUSY signal OFF timing.
Acesst 1.0 6251194
Содержание FZ4 Series
Страница 1: ...User s Manual Cat No Z318 E1 02B Vision Sensor FZ4 Series...
Страница 12: ...1 Before Operation 10 Operation Flow FZ4 User s Manual Operation Flow Here describes the operation flow...
Страница 38: ...1 Before Operation 36 Setting Operation Mode FZ4 User s Manual 1 CPU 2 CPUs FZ4 11 H11 only...
Страница 112: ...3 Performing Test Measurement Starting Operation 110 Useful Functions for Operation FZ4 User s Manual...
Страница 326: ...4 Using Tool 324 Remotely Operating the Controller Remote Operation FZ4 User s Manual Enter the IP address...
Страница 330: ...4 Using Tool 328 Remotely Operating the Controller Remote Operation FZ4 User s Manual...
Страница 351: ...6 Changing the System Environment FZ4 User s Manual Setting the System Operation Environment 349 Communication...
Страница 566: ......
Страница 648: ...8 Appendixes 646 Manual Revision History FZ4 User s Manual...
Страница 654: ...652 FZ4 User s Manual...
Страница 655: ......