DMTA-10040-01EN, Rev. E, February 2018
List of Figures
354
Figure 5-215 Adjusting the gain and angle ......................................................................... 275
Figure 5-216 The 40 % OD and 60 % OD flaws set as a reference image ....................... 276
Figure 5-217 The scan of the entire length of the tube ...................................................... 276
Figure 5-218 Renaming the file ............................................................................................. 277
Figure 5-219 The overlay (background voltage plane for absolute RFT signal analysis)
Figure 5-220 The readings for 40 % OD loss (left) and 60 % OD loss (right) ................. 279
Figure 5-221 A finned air-cooler tube (fin-fan) ................................................................... 279
Figure 5-222 The NFT inspection technology ..................................................................... 280
Figure 5-223 The differential exciter-pickup configuration .............................................. 280
Figure 5-224 Example NFT signal responses (differential configuration) ..................... 281
Figure 5-225 The NFT Pitting application ........................................................................... 282
Figure 5-226 Example of lower signal lobe when pulling the probe over a flaw .......... 283
Figure 5-227 The scan signal of the thru-wall hole ............................................................ 283
Figure 5-228 Adjusting the signal phase ............................................................................. 284
Figure 5-229 Adjusting the gain ........................................................................................... 284
Figure 5-230 The SWP + IMP display .................................................................................. 285
Figure 5-231 The SWP + IMP display after inspecting the entire tube ........................... 286
Figure 5-232 An NFT probe with an absolute exciter-pickup configuration ................. 286
Figure 5-233 Example signal response (NFT absolute configuration) ............................ 287
Figure 5-234 The NFT Erosion and Corrosion application ............................................... 288
Figure 5-235 The scan signal of the 60 % wall-loss groove ............................................... 289
Figure 5-236 Adjusting the signal phase ............................................................................. 289
Figure 5-237 Adjusting the gain ........................................................................................... 290
Figure 5-238 The 40 % wall-loss groove (
left
) and 60 % wall-loss groove (
right
) ........... 291
Figure 5-239 The SWP + IMP display after inspecting the entire tube ........................... 292
Figure 5-240 Alarm DEFINE menu ...................................................................................... 293
Figure 5-241 Alarm polarity .................................................................................................. 294
Figure 5-242 Alarm menu ...................................................................................................... 295
Figure 5-243 Alarm polarity .................................................................................................. 296
Figure 6-1
The Import File Wizard folder selection ....................................................... 298
The Import File Wizard transfer process start ............................................. 299
The Import File Wizard transfer process completion ................................. 300
The NORTEC PC Device menu ..................................................................... 301
The message indicating the charger/adaptor is not connected ................. 303
The message indicating the charger/adaptor is connected ........................ 304
Содержание nortec 600
Страница 8: ...DMTA 10040 01EN Rev E February 2018 Table of Contents viii...
Страница 16: ...DMTA 10040 01EN Rev E February 2018 Labels and Symbols 6...
Страница 30: ...DMTA 10040 01EN Rev E February 2018 Introduction 20...
Страница 58: ...DMTA 10040 01EN Rev E February 2018 Chapter 1 48...
Страница 71: ...DMTA 10040 01EN Rev E February 2018 Software User Interface 61 Press the Return key to exit...
Страница 72: ...DMTA 10040 01EN Rev E February 2018 Chapter 2 62...
Страница 342: ...DMTA 10040 01EN Rev E February 2018 Chapter 7 332...
Страница 356: ...DMTA 10040 01EN Rev E February 2018 Appendix B 346...
Страница 366: ...DMTA 10040 01EN Rev E February 2018 List of Figures 356...
Страница 368: ...DMTA 10040 01EN Rev E February 2018 List of Tables 358...