3-26
PMP320HDW2v1
Preliminary
JUL 2010
PMP 320 Hardware Installation
Unpacking Components
Unpacking Components
When you receive products, carefully inspect all shipping boxes for signs of damage. If you find
damage, immediately notify the transportation company.
As you unpack the equipment, verify that all the components that you ordered have arrived.
Save all the packing materials to use later, as you transport the equipment to and from
installation sites.
Содержание PMP 320
Страница 1: ...PMP 320 Hardware Installation PMP320HDW2v1 JUL 2010 Preliminary 2010 Motorola Inc All Rights Reserved ...
Страница 8: ...Preliminary JUL 2010 iv PMP320HDW2v1 ...
Страница 31: ......
Страница 51: ...JUL 2010 Preliminary AP Hardware Installation complete Chapter 2 AP Hardware Installation 2 20 PMP320HDW2v1 ...
Страница 78: ...Preliminary JUL 2010 Chapter 4 Cables ...
Страница 85: ......
Страница 123: ...JUL 2010 Preliminary Chapter 7 Connectorized CSM Antenna Installation Instructions PMP320HDW2v1 7 1 ...
Страница 133: ...PMP320HDW2v1 7 31 JUL 2010 Preliminary Chapter 8 Regulatory Legal and Safety Notices ...
Страница 141: ...PMP320HDW2v1 8 39 Preliminary JUL 2010 inches PMP 320 AP At least 50 cm approximately 20 inches ...