Earth Ground cable assembly and connection
Procedure 2-2 Cabling and grounding the AP (Continued)
3
Run a 10 AWG ground strap from the ground lug on the AP to known good
ground (Protective Earth - PE).
AP Ground Lug
Ground the radio to the tower.
4
Be sure to reattach the bottom cover of the AP connection cover.
Содержание PMP 320
Страница 1: ...PMP 320 Hardware Installation PMP320HDW2v1 JUL 2010 Preliminary 2010 Motorola Inc All Rights Reserved ...
Страница 8: ...Preliminary JUL 2010 iv PMP320HDW2v1 ...
Страница 31: ......
Страница 51: ...JUL 2010 Preliminary AP Hardware Installation complete Chapter 2 AP Hardware Installation 2 20 PMP320HDW2v1 ...
Страница 78: ...Preliminary JUL 2010 Chapter 4 Cables ...
Страница 85: ......
Страница 123: ...JUL 2010 Preliminary Chapter 7 Connectorized CSM Antenna Installation Instructions PMP320HDW2v1 7 1 ...
Страница 133: ...PMP320HDW2v1 7 31 JUL 2010 Preliminary Chapter 8 Regulatory Legal and Safety Notices ...
Страница 141: ...PMP320HDW2v1 8 39 Preliminary JUL 2010 inches PMP 320 AP At least 50 cm approximately 20 inches ...