6-6
PMP320HDW2v1
Preliminary
JUL 2010
Building
’s
wal
l
Cabling Overview
Chapter 6: Connectorized CSM Hardware Installation
Figure 6-4 CSM mounted to a wall
Building’s Roof
CPE Bracket
assembly attached to
building's exterior
Connectorized CSM
*antenna not shown
Subscriber’s
Computer
CPE
Power/Ethernet
cable
Dsine
CPE Bracket
assembly attached to
building's exterior
Surge
Suppressor
Ethernet cable
(not supplied)
Ground wire
(not supplied)
to household
grounding point
Содержание PMP 320
Страница 1: ...PMP 320 Hardware Installation PMP320HDW2v1 JUL 2010 Preliminary 2010 Motorola Inc All Rights Reserved ...
Страница 8: ...Preliminary JUL 2010 iv PMP320HDW2v1 ...
Страница 31: ......
Страница 51: ...JUL 2010 Preliminary AP Hardware Installation complete Chapter 2 AP Hardware Installation 2 20 PMP320HDW2v1 ...
Страница 78: ...Preliminary JUL 2010 Chapter 4 Cables ...
Страница 85: ......
Страница 123: ...JUL 2010 Preliminary Chapter 7 Connectorized CSM Antenna Installation Instructions PMP320HDW2v1 7 1 ...
Страница 133: ...PMP320HDW2v1 7 31 JUL 2010 Preliminary Chapter 8 Regulatory Legal and Safety Notices ...
Страница 141: ...PMP320HDW2v1 8 39 Preliminary JUL 2010 inches PMP 320 AP At least 50 cm approximately 20 inches ...