Attach the AP assembly to a pole
Chapter 2: AP Hardware Installation
Procedure 2-3 Attaching the AP assembly to a pole (Continued)
2
Install the top and bottom clamps to the pipe. Slide the clamp bracket on to
the carriage bolts. Slide on a 3/8-16 flat washer, 3/8-16 split lock washer and
a 3/8-16 hex nut to each carriage bolt.
NOTE
•
Align the AP setting the desired downtilt degree using the
inclinometer.
•
The network planner should provide the antenna pattern
information for the installation. The network is planned from
true north 0 degrees. Use a compass to ensure there is no
overlap of the antennas as they are installed.
Tighten the hex nut to 10 ft-lbs (13.5 N.m) after the AP has been aligned to
the optimum downtilt position.
3
Connect the Ethernet cable from the AP to the CMM4 port controller. There
are up to 14 ports in one CMM4 switch, but only 8 ports on the CMM4
motherboard that can power up a radio. Ensure that surge suppression has
been installed for this connection. See the section on Surge Suppression
Information. Follow the site plan created by the network planner when
connecting cables to the CMM4 switch.
Continued
Содержание PMP 320
Страница 1: ...PMP 320 Hardware Installation PMP320HDW2v1 JUL 2010 Preliminary 2010 Motorola Inc All Rights Reserved ...
Страница 8: ...Preliminary JUL 2010 iv PMP320HDW2v1 ...
Страница 31: ......
Страница 51: ...JUL 2010 Preliminary AP Hardware Installation complete Chapter 2 AP Hardware Installation 2 20 PMP320HDW2v1 ...
Страница 78: ...Preliminary JUL 2010 Chapter 4 Cables ...
Страница 85: ......
Страница 123: ...JUL 2010 Preliminary Chapter 7 Connectorized CSM Antenna Installation Instructions PMP320HDW2v1 7 1 ...
Страница 133: ...PMP320HDW2v1 7 31 JUL 2010 Preliminary Chapter 8 Regulatory Legal and Safety Notices ...
Страница 141: ...PMP320HDW2v1 8 39 Preliminary JUL 2010 inches PMP 320 AP At least 50 cm approximately 20 inches ...