- 88 -
IMPORTANT!
Following any installation, set-up and/or adjustment related to the power positioning
system always test the system over its full range of positioning functions to ensure all motors, safety
limits are functioning correctly. Verify that all mounting hardware and critical components are also
installed/adjusted properly.
1.
Check all fasteners/mounting hardware to ensure that they have been properly tightened.
2.
Check the drive lockout limit is functioning.
3.
Check the reduced speed drive limit setting (if applicable)
4.
Check the max. tilt (tilt/recline) limit (if applicable).
5.
Check the full range of tilt, recline anterior tilt and elevate/reach (as applicable). Make certain
there is no interference. Verify that the wheelchair remains stable with the client in it over the
entire range of power positioning functions.
6.
Check power legrest function (if applicable). Ensure there is appropriate ground clearance
in the retracted position, and check for interference over the full range of travel.
7.
Check all wires and cables over the complete range of tilt/recline/elevate/reach/ power legs
for pulling, crushing, pinching or tight bends.
8.
Check that the anti-tipper extensions are installed (if required).
9.
Check that the front anti-tipper latch mechanism is adjusted properly for the user.
10.
Check the front anti-tipper lockout is functioning properly.
11.
Check that the battery charger functions properly.
12..
Check that the acceleration and deceleration of the wheelchair have been programmed
to levels appropriate for the user.
13.
Check all of the wheelchair drive functions.
14.
Test drive the wheelchair and operate the power positioning system.
15.
Ensure the Owner’s Manual is provided to the end user.
The following checklist is provided as a reference when conducting a final review/ inspection of the wheelchair.
If you have any concerns or questions regarding your Motion Concepts Power Positioning
System please contact our Technical Service Department for assistance.
USA:
888-433-6818
CAN:
800-680-4191
6.0 SYSTEM INSTALLATION/ ADJUSTMENT REVIEW
6.0 SYSTEM INSTALLATION/ ADJUSTMENT REVIEW
6.1 System Review Checklist
Содержание ULTRA-LOW MAXX UPFRONT MPPS
Страница 99: ......