• Measure minimum 45 mm in from one end of the rail system. Use the drill guide (art 1109998)
and drill a Ø11 mm hole at this point, that goes through the upper part of the driveway.
• Mount end stop (article 1109410/1109411), observe that the M10 bolt comes through the Ø11
hole drilled earlier. This ensures that the end stop does not come out of the rail, if the bolt by
any chance should come loose.
Remember Loctite 243 (colour = blue) on the screw, tighten with 40 Nm.
• Mount end stop in the other end of the system, with drill guide and long bolt as described
above.
Remember Loctite 243 (colour = blue) on the screw, tighten with 40 Nm.
• Mount end caps at both ends of the profile.
• Check and test the system according to the check list from Molift AS. The check list is to be
signed by the fitter and filed by the owner of the system; a copy of the check list is filed by the
supplier.
• Finally mark the system, see illustration for correct marking at one end of the rail. It is not per-
mitted to take the system into use before the marking has been made.
Page 76 of 106
Chapter 4 – Mounting of Molift Rail System
Rev E 10/2011
Mounting procedure for wall bracket
Содержание Rail System
Страница 2: ...MOLIFT RAIL SYSTEM HANDBOOK PART NO TM19101 REVISION E 09 2011 ...
Страница 14: ...Page 12 of 106 Chapter 1 Ceiling hoist systems Rev E 10 2011 Definitions ...
Страница 26: ...Page 24 of 106 Chapter 2 Specification of ceiling hoist system Rev E 10 2011 Choosing Rail system and hoist ...
Страница 104: ...Page 102 of 106 Chapter 4 Mounting of Molift Rail System Rev E 10 2011 Checklist for fitting Molift Rail System ...
Страница 107: ......
Страница 111: ......