• Carefully measure up and mark the holes for the MRS switch system and adjacent profiles
• Drill a ø10mm hole into the concrete, 45 mm deep and clean with compressed air. Hole posi-
tioning in accordance with the template sketch for the MRS switch system.
• Fit a drop-in anchor to the ceiling in accordance with description on page 51
• Fit T-profile washers, screws and o-rings as shown on page 61, to the switch system and adja-
cent profiles.
• Then fit the switch system and adjacent pro-
files to the anchors in the ceiling. Do not
tighten any bolts before the profiles are in
place.
• Screw 1109323 is to be tightened to 20 Nm.
Remember to apply Loctite 243 to all fitting
screws.
• Carry out rail and final mounting, and fill in the fitting checklist.
Fitting directly to rafters, part number 1109366 (SWL 300 kg)
• Carefully measure up and mark the holes for the MRS switch system and adjacent profiles. It
is important that the beams are prepared for fitting, which means that reinforcement (splices)
must be fitted between rafters to ensure screw holding. Hole positioning in accordance with
the template sketch for the MRS switch system. See figure 3.
• Add a T-profile washer to the track of the profiles. Lock these in place with tape. See picture.
• Fit the switch systems and adjacent profiles using wood screw 1109319. Do not tighten any
screws before the profiles are in position
• Wood screws 1109319 are to be tightened to 40 Nm
• Carry out rail and final mounting, and fill in the fitting checklist.
Fitting telescope bracket to concrete, part number 1109370-371-372-372 (SWL 300 kg)
• Carefully measure up and mark the holes for the brackets for the MRS switch system and ad-
jacent profiles. Check that telescopic brackets have the correct suspension height measure-
ments.
• Refer to fig 3 for the distance between the centres of the switch system telescopic brackets.
• Pre-drill an ø1/4” hole, minimum 65 mm deep, for concrete screw 1109358. 3 holes per brack-
et.
• Fit the ceiling sections of the telescopic bracket for the switch system and adjacent profiles.
Concrete screws 1109359 are to be tightened to 15 Nm. This can be loosened and be re-tight-
ened for final fine adjustment.
• Carry out rail and final mounting, and fill in the fitting checklist
Fitting of telescope bracket to rafters, part number 1109390-391-392-393 (SWL 300 kg)
• Carefully measure up and mark the holes for the brackets for the MRS switch system and ad-
jacent profiles. Check that telescopic brackets have the correct suspension height measure-
ments.
• It must be ensured, before fitting, that there is sufficient material and holding in the ceiling
structure. If this is not the case , then reinforcement must be fitted. Molift is not responsible for
the calculation associated with and the fitting of reinforcement to rafters.
• Refer to fig 3 for the distance between the centres of the switch system telescopic brackets.
• The roof section of the telescope bracket is fitted using 3 x RSS Screws (part no. 1109319), or as
specified on page 63. This is dependant on access to the rafters when fitting.
• Fit the ceiling sections of the telescopic brackets for the switch system and adjacent profiles.
Wood screws 1109319 are to be tightened to 40 Nm. This can be loosened and be re-tightened
Page 94 of 106
Chapter 4 – Mounting of Molift Rail System
Rev E 10/2011
Mounting of Switch
Содержание Rail System
Страница 2: ...MOLIFT RAIL SYSTEM HANDBOOK PART NO TM19101 REVISION E 09 2011 ...
Страница 14: ...Page 12 of 106 Chapter 1 Ceiling hoist systems Rev E 10 2011 Definitions ...
Страница 26: ...Page 24 of 106 Chapter 2 Specification of ceiling hoist system Rev E 10 2011 Choosing Rail system and hoist ...
Страница 104: ...Page 102 of 106 Chapter 4 Mounting of Molift Rail System Rev E 10 2011 Checklist for fitting Molift Rail System ...
Страница 107: ......
Страница 111: ......