Door openings
A rail system can cover several rooms and there are then two ways to get from one room to the
other.
One possibility is to install separate systems in the rooms and use the “climbing principle” to get
from one to the other, see the user manual of the hoist for details. If the system used is Molift Hi-
Trac, a hoist is to be installed for each system. When climbing with Molift Hi-Trac, the SWL should
not exceed 160 kg
Molift Nomad requires a trolley for each system, and the hoist is then moved from one trolley to
the other by means of climbing.
Another possibility is to make a split above the door opening so that the rail system can continue
from one room to the other. The figure below states the necessary measures for installation of rails
with a split which is adjusted to the trolley. A trolley with an extended strap for the securing point
is used for Molift Nomad. In this way the hoist cannot go all the way up above the door frame, and
squeezing between hoist and doorway is avoided.
Figure 9.
Doorway with continuos rail and Molift Nomad
Page 18 of 106
Chapter 2 – Specification of ceiling hoist system
Rev E 10/2011
How to plan and mount a rail system?
Содержание Rail System
Страница 2: ...MOLIFT RAIL SYSTEM HANDBOOK PART NO TM19101 REVISION E 09 2011 ...
Страница 14: ...Page 12 of 106 Chapter 1 Ceiling hoist systems Rev E 10 2011 Definitions ...
Страница 26: ...Page 24 of 106 Chapter 2 Specification of ceiling hoist system Rev E 10 2011 Choosing Rail system and hoist ...
Страница 104: ...Page 102 of 106 Chapter 4 Mounting of Molift Rail System Rev E 10 2011 Checklist for fitting Molift Rail System ...
Страница 107: ......
Страница 111: ......