• Press the traverse rail into place on the telescope trolley (2).
• The other end is lifted up so that it can be attached to the fixed trolley (1). Attach the multi-
bolts and nuts (7) and tighten.
Figure 65.
Fitting of traverse rail to telescope trolley and fixed trolley
• Attach the support block and bolts (6) to the fixed trolleys.
Figure 66. Fitted wall rails with traverse
• Carry out testing and fill out the assembly checklist.
Page 88 of 106
Chapter 4 – Mounting of Molift Rail System
Rev E 10/2011
Assembly of wall rail for traverse
Содержание Rail System
Страница 2: ...MOLIFT RAIL SYSTEM HANDBOOK PART NO TM19101 REVISION E 09 2011 ...
Страница 14: ...Page 12 of 106 Chapter 1 Ceiling hoist systems Rev E 10 2011 Definitions ...
Страница 26: ...Page 24 of 106 Chapter 2 Specification of ceiling hoist system Rev E 10 2011 Choosing Rail system and hoist ...
Страница 104: ...Page 102 of 106 Chapter 4 Mounting of Molift Rail System Rev E 10 2011 Checklist for fitting Molift Rail System ...
Страница 107: ......
Страница 111: ......