for final fine adjustment.
• Carry out rail and final mounting, and fill in the fitting checklist
Rail and final mounting
• Adjust the telescopic part of the bracket temporarily to the correct building-in height using an
M6 set screw on the stem.
• Insert the correct number of multibolts (part no.1109306) to the MRS profile from one end.
Two multibolts per securing bracket are required.
• With all brackets correctly mounted, lift up the MRS profile to the bottom of the brackets. De-
pending on the length of the path, lifting jacks should be used for this process.
• Mount the MRS profile onto the brackets using multibolts (part no.1109306) which are locked
using a lock nut (part no.1120315) and a washer (part no.1120312). Tighten with torque 40
Nm.
• Adjust the built-in measures using a (laser) level. The correct position is secured and main-
tained using an M8 set screw on the stem of the bracket.
• When the entire path is level at the correct height, drill a hole Ø11 through the stem of the tel-
escopic bracket. The building-in assembly is secured using a through screw and a lock nut. The
tightening torque is 50 Nm.
Rev E 10/2011
Chapter 4 – Mounting of Molift Rail System
Page 95 of 100
Mounting of Switch
Содержание Rail System
Страница 2: ...MOLIFT RAIL SYSTEM HANDBOOK PART NO TM19101 REVISION E 09 2011 ...
Страница 14: ...Page 12 of 106 Chapter 1 Ceiling hoist systems Rev E 10 2011 Definitions ...
Страница 26: ...Page 24 of 106 Chapter 2 Specification of ceiling hoist system Rev E 10 2011 Choosing Rail system and hoist ...
Страница 104: ...Page 102 of 106 Chapter 4 Mounting of Molift Rail System Rev E 10 2011 Checklist for fitting Molift Rail System ...
Страница 107: ......
Страница 111: ......