![Molift Rail System Скачать руководство пользователя страница 80](http://html1.mh-extra.com/html/molift/rail-system/rail-system_project-planning-and-installation_1824209080.webp)
Mounting procedure for traverse
A traverse solution always comprises two primary rails and a secondary rail. The primary rails are
mounted first, it is important to mount these entirely parallel. The secondary rail is mounted either
between the primary rails or hanging below, depending on the mounting of the secondary rail on
a trolley. See illustrations below for an outline and important measures. The ceiling hoist is always
installed on the secondary rail.
It is important to estimate the location of the secondary rail in relation to other installations, either
existing installations in the ceiling or future ones. The secondary rail may not interfere with lamps
in the ceiling, fire alarms, fire extinguishing systems etc.
• Make sure to have the necessary tools, auxiliary tools and protective equipment at hand be-
fore starting the work.
• Use a chalk line to mark out the location of both or one of the primary rails. When one pri-
mary rail is entirely straight also in relation to the room, the other primary rail can be mount-
ed parallel to the first one. Max deviation is ± 3mm. If a mounting bracket for lowering (part
no.1109201 or 1109202) is used, shims (part no.110912-1109313-1109314) are used to adjust
primary rail 2 to its correct location. Loosen the bracket and place shims under the bracket at
the desired spot until the rail is correctly located. Remember to tighten between each measur-
ing and at the end.
• At the end of the primary rail where the trolley for the secondary rail is to be mounted, there
must be a maximum of 50 cm clearance before the wall (this space is required to lift the com-
plete traverse rail to its position). On the opposite side the primary rail can go all the way to
the wall. In some cases the primary rails can extend from one wall to another. In this case the
trolleys are mounted in the primary rails before they are mounted.
The primary rails can be mounted from wall to wall. In these situations trolleys have to be
mounted into the primary rails before installation.
• A total of four end stops (part no.1109411) with bumpers are mounted in the primary rails. Re-
member that the bumpers must point towards the trolley in both ends. Apply Loctite 243 (col-
our = blue) to the mounting screws. The tightening torque is 40 Nm. Remember the torque
wrench!
• A total of two end stops are mounted in the secondary rail. The type of end stop must be ad-
justed to the type of hoist (Nomad or Hi-Trac).
Page 78 of 106
Chapter 4 – Mounting of Molift Rail System
Rev E 10/2011
Mounting procedure for traverse
Содержание Rail System
Страница 2: ...MOLIFT RAIL SYSTEM HANDBOOK PART NO TM19101 REVISION E 09 2011 ...
Страница 14: ...Page 12 of 106 Chapter 1 Ceiling hoist systems Rev E 10 2011 Definitions ...
Страница 26: ...Page 24 of 106 Chapter 2 Specification of ceiling hoist system Rev E 10 2011 Choosing Rail system and hoist ...
Страница 104: ...Page 102 of 106 Chapter 4 Mounting of Molift Rail System Rev E 10 2011 Checklist for fitting Molift Rail System ...
Страница 107: ......
Страница 111: ......