• Use bit HSD-G, article 1109348 and hammer. Knock in the bit until a cross appears in the collar
of the anchor.
The anchor is not ready for use until the cross appears. In the worst case the anchor may loosen
and fall out after mounting!
• Apply Loctite 243 to the thread of the screw to make sure the threads lock.
• Tighten the screw using a torque wrench. Tightening torque = 20 Nm.
If the anchor is tightened too much, it may break!
Rev E 10/2011
Chapter 4 – Mounting of Molift Rail System
Page 55 of 100
Mounting procedure for drop-in anchor
Содержание Rail System
Страница 2: ...MOLIFT RAIL SYSTEM HANDBOOK PART NO TM19101 REVISION E 09 2011 ...
Страница 14: ...Page 12 of 106 Chapter 1 Ceiling hoist systems Rev E 10 2011 Definitions ...
Страница 26: ...Page 24 of 106 Chapter 2 Specification of ceiling hoist system Rev E 10 2011 Choosing Rail system and hoist ...
Страница 104: ...Page 102 of 106 Chapter 4 Mounting of Molift Rail System Rev E 10 2011 Checklist for fitting Molift Rail System ...
Страница 107: ......
Страница 111: ......