![Molift Rail System Скачать руководство пользователя страница 62](http://html1.mh-extra.com/html/molift/rail-system/rail-system_project-planning-and-installation_1824209062.webp)
Mounting in concrete with lowered ceiling
Telescope bracket with TFS
It is important that the concrete is in the right quality so that the securing brackets can handle the
load for which they are intended. Molift specifies concrete according to standard NS-EN 206-1 and
all associated standards. The requirement for rigidity is quality B30 (C30/C37) or better.
This mounting will hold all weight classes up to and including SWL = 300 kg.
There are two solutions that can be used for fitting to concrete. One alternative to drop-in anchors
is concrete screw GRK Caliburn XL.
• Make sure to have the necessary tools, auxiliary tools and protective equipment at hand be-
fore starting the work.
• Use measuring equipment to mark up/define where the centre of the path is to be.
• Then measure the centre distances to the built-in brackets. If there are joints on the path, re-
member to place a securing point above each joint.
• Use the securing template to mark out the location of the holes. The template has a sight for
the centre line for the path. See illustration below.
Fitting using a drop-in anchor (Part no. 1109251/1109255)
• Drill a hole Ø12 x 43 mm using the hammer drill, 3 holes for each bracket.
• Mount drop-in anchors (article 1109326) according to the mounting instructions, with the cor-
rect bit and depth. Use only drop-in anchors with flange to avoid hammering the anchor too
deeply into the concrete layer.
• Mount a stud screw M10 x 70 (article 1120370) in each of the drop-in anchors. Use a counter
nut on the lock nut and tighten with a torque of 20 Nm for each stud screw.
Page 60 of 106
Chapter 4 – Mounting of Molift Rail System
Rev E 10/2011
Mounting in concrete with lowered ceiling
Содержание Rail System
Страница 2: ...MOLIFT RAIL SYSTEM HANDBOOK PART NO TM19101 REVISION E 09 2011 ...
Страница 14: ...Page 12 of 106 Chapter 1 Ceiling hoist systems Rev E 10 2011 Definitions ...
Страница 26: ...Page 24 of 106 Chapter 2 Specification of ceiling hoist system Rev E 10 2011 Choosing Rail system and hoist ...
Страница 104: ...Page 102 of 106 Chapter 4 Mounting of Molift Rail System Rev E 10 2011 Checklist for fitting Molift Rail System ...
Страница 107: ......
Страница 111: ......