![Molift Rail System Скачать руководство пользователя страница 61](http://html1.mh-extra.com/html/molift/rail-system/rail-system_project-planning-and-installation_1824209061.webp)
• Pump 2-component mortar into the centring cap until you see the mortar. It is enough to
pump 4-6 times. A dispenser of 330 ml will be sufficient for approx 9 holes, Ø16 and 95 mm
deep.
• During curing (4 minutes at 20°C) the anchor rod (article 1109328) is pressed into the mortar.
Remove surplus mortar escaping from the mounting place before curing.
• After the anchor screw has been correctly placed you must leave it until the mortar has cured
(45 minutes at 20°C).
• When mounting a bracket on to the anchor rod, the accompanying lock nut is used to secure
the mounting.
• Use a torque wrench for tightening. Maximum tightening torque of the anchor is 4 Nm.
Illustrations for mounting procedure for chemical anchor with mesh sleeve in wall
Part no.: 1109273 and 1109273
Rev E 10/2011
Chapter 4 – Mounting of Molift Rail System
Page 59 of 100
Mounting procedure for chemical anchor with mesh sleeve in wall
Содержание Rail System
Страница 2: ...MOLIFT RAIL SYSTEM HANDBOOK PART NO TM19101 REVISION E 09 2011 ...
Страница 14: ...Page 12 of 106 Chapter 1 Ceiling hoist systems Rev E 10 2011 Definitions ...
Страница 26: ...Page 24 of 106 Chapter 2 Specification of ceiling hoist system Rev E 10 2011 Choosing Rail system and hoist ...
Страница 104: ...Page 102 of 106 Chapter 4 Mounting of Molift Rail System Rev E 10 2011 Checklist for fitting Molift Rail System ...
Страница 107: ......
Страница 111: ......