above.
Remember Loctite 243 (colour = blue) on the screw, tighten with 40 Nm.
• Mount the ceiling now; Molift is not responsible for mounting of the lowered ceiling.
• Check and test the system according to the check list from Molift AS. The check list is to be
signed by the fitter and filed by the owner of the system; a copy of the check list is filed by the
supplier.
• Finally mark the system, see illustration for correct marking at one end of the rail. It is not per-
mitted to take the system into use before the marking has been made.
Mounting directly in rafters layer
Rev E 10/2011
Chapter 4 – Mounting of Molift Rail System
Page 69 of 100
Mounting directly in rafters layer
Содержание Rail System
Страница 2: ...MOLIFT RAIL SYSTEM HANDBOOK PART NO TM19101 REVISION E 09 2011 ...
Страница 14: ...Page 12 of 106 Chapter 1 Ceiling hoist systems Rev E 10 2011 Definitions ...
Страница 26: ...Page 24 of 106 Chapter 2 Specification of ceiling hoist system Rev E 10 2011 Choosing Rail system and hoist ...
Страница 104: ...Page 102 of 106 Chapter 4 Mounting of Molift Rail System Rev E 10 2011 Checklist for fitting Molift Rail System ...
Страница 107: ......
Страница 111: ......