![Molift Rail System Скачать руководство пользователя страница 105](http://html1.mh-extra.com/html/molift/rail-system/rail-system_project-planning-and-installation_1824209105.webp)
Chapter 5 - Maintenance
Molift recommends periodic inspections of the system once a year according to “Control points
for periodic inspections” on the next page.
Inspections are to be performed by certified staff.
A check list is filled in and signed for each inspection of the system and filed by the owner of the
system.
Rev E 10/2011
Chapter 5 - Maintenance
Page 103 of 100
Содержание Rail System
Страница 2: ...MOLIFT RAIL SYSTEM HANDBOOK PART NO TM19101 REVISION E 09 2011 ...
Страница 14: ...Page 12 of 106 Chapter 1 Ceiling hoist systems Rev E 10 2011 Definitions ...
Страница 26: ...Page 24 of 106 Chapter 2 Specification of ceiling hoist system Rev E 10 2011 Choosing Rail system and hoist ...
Страница 104: ...Page 102 of 106 Chapter 4 Mounting of Molift Rail System Rev E 10 2011 Checklist for fitting Molift Rail System ...
Страница 107: ......
Страница 111: ......