
1039
FDC-HKXR
The high pressure control consists of the HP protection, HP-A control, HP-B control and LP control and the order of priority
among them is assigned as HP protection >HP-A > LP > HP-B down > HP-B up.
(16) High pressure control
Pressure switch [If 63H1: 3.24 open/2.65 close MPa (33 Open/27 close kgf/cm
2
) is actuated twice within 45 minutes, the
operation is stopped due to the error and the check and indication (Remote controller: E40, indoor LED-green; repeated flickers,
red: dark, outdoor LED-green; reperted flickers, red; 3 flickers) are performed. In case of initial operation, however, the
compressor is stopped and after a delay of 3 minutes it returns to the normal operation.]
HP protection
• If the pressure switch (63H
2
) is actuated, the outdoor blower is opreated in the Hi mode (for the operations of patterns A
1
to C
1
)
or stopped (for the operations of patterns C
2
to E
2
) and, if it is still actuated 2 minutes after a drop of 10 Hz in the inverter
frequency, the frequency is dropped futher by 10 Hz. (Minimum frequency is specified at the partial load of 35 Hz.)
• Operation returns to the normal mode after operating with the frequency control at off
(1)
6 minutes after the 63H
2
having been reset.
HP-A control
Note (1): If the high pressure A control is released,the frequency is raised by 5 Hz and retained at the level for 3 minutes. The
frequency is then raised by 5 Hz at 3-minute intervals till it returns to the normal operation.
(ii) When SW
5-1
on the PCB of indoor unit is turned on at the field.
Input signal to CnT becomes valid at OFF
→
ON only and the motion of air conditioner [ON/OFF] is inverted.
CnT Input
A Unit
B Unit
OFF
OFF
OFF
ON
OFF
ON
OFF
ON
ON
OFF
OFF
Capacirty
Full load
Hot gas bypass
Ferquency (Hz)
10
0
20 3035 40 45 50 55 60 70 80 90
(15) Control of Coompressor Capacity
When the load is set as low as less than 35Hz of full load operation frequency
(1)
to expand the capacity control range in the low
load area, a hot gas bypass
(2)
(full load conversion frequency:23Hz to 35Hz) is selected. (20V
F
: OFF, 20V
U
: ON)
Also, when the full load conversion frequency comes to over 35Hz
during a hot gas bypass operation, a full load operation is selected.
The compressor starts with a hot gas bypass all the time and, after
15 seconds, selects the load and the frequency according to the
demand(decision) frequency.
Notes (1) Full load operation frequency:
35Hz~95Hz(every 5Hz)
(2) Hot gas bypass operation frequency:
35Hz~45Hz(every 5Hz)
(3) The change-over occurs when 5 minutes of more
operation time has passed.
OFF
5
°
C
3
°
C
ON
(Outdoor air temperature)
(14) Snow Fan Control
Set the dip switch SW
3-3
(See page 1075) on the outdoor unit control circuit board to ON, and the outdoor fan of a standing unit
is operated at the Hi speed for 10 seconds every 10 minutes when the outdoor air temperature drops below 3
°
C.
Содержание SRRM40HENG-L
Страница 1: ...MITSUBISHI DAIYA 2000 AIR CONDITIONING HEAT PUMP MACHINERY HANDBOOK ...
Страница 52: ...50 SRK GZ MEMO ...
Страница 94: ...92 SRK H MEMO ...
Страница 104: ...102 102 SRK C MEMO ...
Страница 180: ...178 SCM HG 4room MEMO ...
Страница 222: ...220 SCM HG 2room MEMO ...
Страница 234: ...232 SCM CG 2room MEMO ...
Страница 266: ...SCM C 264 MEMO ...
Страница 406: ...404 FDT N C MEMO ...
Страница 442: ...440 FDEN H MEMO ...
Страница 470: ...468 FDEN C MEMO ...
Страница 504: ...502 FDKN H MEMO ...
Страница 580: ...578 FDR H MEMO ...
Страница 698: ...696 V MULTI Models FDR258 A 308 A ...
Страница 724: ...722 V MULTI MEMO ...
Страница 1094: ...1092 FDC HKXR MEMO ...