-
Remove the insulation from the cable ends and keep the strands short.
-
Connect the screens to the screen clamping rail using cable clamps, see Chapter
-
Establish equipotential bonding between instruments/system modules (mandatory
for Ex-applications.)
4.3
EMC-compliant installation
-
Use only screened data cables.
-
Connect screens on both sides to ground.
-
Keep non-screened cable ends short.
-
Make equipotential bonding conductor connections between screen clamping rail
and cabinet/housing.
-
Use metal or metalized connector casings.
-
Establish equipotential bonding between instruments/system modules (mandatory
for Ex-applications.
-
Use standard reference potential.
-
Connect mounting rail to protective earth.
-
Install measure and data cables separately from power cables.
No.
Description
1
Screen clamp (e.g. Phoenix SK8-D)
2
Screen rail (e.g. Phoenix NLS-CU 3/10)
3
Rail connector bracket (e.g. Phoenix AB-SK 65D)
4
Mounting rail (35 mm)
4 Device installation
Transmitter Series PR 5220
EN-25
Minebea Intec
Содержание PR 5220 Series
Страница 26: ...3 6 Overview of connections 3 Device description Transmitter Series PR 5220 EN 23 Minebea Intec ...
Страница 234: ......