![Millipore Sigma Steritest Скачать руководство пользователя страница 40](http://html1.mh-extra.com/html/millipore-sigma/steritest/steritest_user-manual_1796939040.webp)
Page 40 of 113
7.
Press the
button to continue. The
Steritest
®
Symbio Pump
Certificate
screen displays:
8.
Do one of the following:
•
To confirm activation of the certificate of conformity:
•
Turn and press the control knob to select
Yes
. The countdown
to the next calibration is set to 12 months, and the following
screen displays:
•
Fill out the activation date on the certificate of quality that
was delivered with the Steritest
®
Symbio Pump.
•
Press the
button to move to next step (autotest
sequence).
•
To skip activation:
•
Turn and press the control knob to select
No
. The autotest
sequence begins automatically.
NOTE
For information about changing the frequency of calibration and for
deactivating the calibration countdown and alerts, see
.