
Workstation 4 and 4 LX Field Service Guide
4-11
WS4 LX Technical Overview
W83627HF Super IO
UART B
UART B is assigned to COM3. COM3 is shared between the Mag Stripe Reader
and Customer Display Port.
See the Customer Display/Mag Card Reader Port section for more information.
RS422 Port A and B Control Signals
Six pins borrowed from the unused parallel port are dedicated to controlling the
multi-protocol RS422-A and RS422-B ports.
COM 3 Mux Control Signals
A total of seven GPIO signals are dedicated to controlling the COM 3 Multiplexer and
LCD interface. See the Customer Display/MSR Interface for more information on
these signals.
Hardware Monitor
The Super IO hardware monitor is configured to display several hardware parameters
including the CPU temperature and voltages including VCORE, VCC3 and
VCCMEM.
Cash Drawer Control
Four pins are dedicated to the Cash Drawer Interface. Two signals,
CD_ST_A
and
CD_ST_B
are used to monitor the cash drawer open/closed status through the WS4
LX API. Drawer open signals
CD_OPEN_A
and
CD_OPEN_B
drive the interface
circuit on Sheet 29.
System Board Hardware Revision
Four pins from the unused Game/MIDI port are connected to the board revision tracks
REV0 - REV3 on the system board. The WS4 LX API examines these pins to report
the System Board hardware revision.See page 4-24 for more details.
Содержание Workstation 4
Страница 38: ...1 26 Workstation 4 and 4 LX Field Service Guide Introduction to the WS4 WS4 LX FRUs LCD Customer Display ...
Страница 86: ...2 48 Workstation 4 and 4 LX Field Service Guide WS4 Technical Overview Optional LCD Customer Display ...
Страница 150: ...4 28 Workstation 4 and 4 LX Field Service Guide WS4 LX Technical Overview System Board Power Distribution ...
Страница 226: ...A 12 Workstation 4 and 4 LX Field Service Guide Connector and Cable Diagrams Hook up Cables ...