Verifying Instrument Operation
Gemini VII 2390 Confirm
72 Gemini VII 2390 Confirm Installation Instructions and Checklist
Feb 09
Verifying Instrument Operation
Procedure
Evaluation
Code
Initial/
Date
Calibrate the 1000-Torr pressure transducers.
P F N/A
Calibrate the servo valves.
P F N/A
Clean the sample tubes.
P F N/A
Install blank sample tubes.
P F N/A
Prepare the Dewar with water.
P F N/A
Perform the blank analysis.
Review the analysis results.They must be within the tolerances shown
below in order for this procedure to pass.
P/Po Tolerance in cm
3
0.1 ±0.008
0.2 ±0.010
0.3 ±0.012
0.4 ±0.014
0.5 ±0.016
0.6 ±0.018
0.7 ±0.020
0.8 ±0.022
0.9 ±0.024
P F N/A
Fill Dewar with LN
2
P F N/A
Measure the Po
P F N/A
Prepare for a Reference Material Analysis.
P F N/A
Degas the sample.
P F N/A
Determine the sample mass.
P F N/A
Install the sample tube with reference material.
P F N/A
Check the LN
2
level in the Dewar
P F N/A