Connecting Gases
Gemini VII 2390 Confirm
46 Gemini VII 2390 Confirm Installation Instructions and Checklist
Feb 09
7.
A report is generated automatically to the screen.
Observe the
Leak Rate
field on the
Instrument to Regulator Shut-off -1
report; it
should display
Passed
, indicating that the gas line from the instrument to the regulator is
clean and leak-free.
If
Failed
is shown, a leak is indicated between this connection. Check the connections
from the instrument to the gas regulator valve. Tighten as necessary, then try the test
again.
8.
Click the
Instrument to Gas Bottle Shut-off - 2
tab to display its report.
Observe the
Leak Rate
field; it should display
Passed
, indicating that the gas line from
the instrument to the gas bottle is clean and leak-free.
Sample Port Pressure vs. Time
Leak Rate: Passed
Actual = 0.0193 mmHg/min
Fail if above = 0.1000 mmHg/min
Sample Port Pressure vs. Time
Leak Rate: Passed
Actual = 0.0234 mmHg/min
Fail if above = 0.1000 mmHg/min