Preparing for Installation
Gemini VII 2390 Confirm
70 Gemini VII 2390 Confirm Installation Instructions and Checklist
Feb 09
Preparing for Installation
Connecting Cables
Installing the Vacuum Pump
Entering Ethernet Settings
Procedure
Evaluation
Code
Initial/
Date
Review the Preinstallation Instructions and Checklist and ensure that the
laboratory is prepared for installation.
P F N/A
Ensure that the required personnel are available.
P F N/A
Ensure that all equipment has been unpacked and verified using the
packing list.
P F N/A
Procedure
Evaluation
Code
Initial/
Date
Connect the power cord to the analyzer and to a power source.
P F N/A
Connect the ethernet cable to the analyzer and to the computer.
P F N/A
Procedure
Evaluation
Code
Initial/
Date
Install the components of the vacuum pump, including oil (if applicable).
P F N/A
Connect the vacuum pump to analyzer.
P F N/A
Plug in the vacuum pump.
P F N/A
Turn on the vacuum pump switch (if applicable).
P F N/A
Turn on the analyzer power switch.
P F N/A
Procedure
Evaluation
Code
Initial/
Date
Enter the ethernet settings.
P F N/A
Configure the firewall setting.
P F N/A