Gemini VII 2390 Confirm
Performing a Blank Analysis
Feb 09 Gemini VII 2390 Confirm Installation Instructions and Checklist
59
Preparing the Dewar
Place a Dewar of water at ambient temperature on the elevator
.
Starting the Blank Analysis
1. Select
Unit [n] > Blank Analysis
; the Blank analysis dialog is displayed.