Gemini VII 2390 Confirm
Installing the Analysis Program
Feb 09 Gemini VII 2390 Confirm Installation Instructions and Checklist
71
Installing the Analysis Program
Connecting Gases
Cleaning and Verifying Gas Lines
Procedure
Evaluation
Code
Initial/
Date
Install the application software.
P F N/A
Add users to Windows User Groups.
P F N/A
Record user information.
P F N/A
Set up User Profiles in the Administrator Utility.
P F N/A
Start the Gemini VII 2390 application.
P F N/A
Procedure
Evaluation
Code
Initial/
Date
Specify units of measure.
P F N/A
Connect the analysis gas to the instrument.
P F N/A
Connect the helium to the instrument.
P F N/A
Procedure
Evaluation
Code
Initial/
Date
Make sure the analysis gas line valves are in the correct state:
Gas bottle shut-off valve
Closed
.
Regulator shut-off valve fully
Open.
Pressure control knob fully
Open
.
P F N/A
Perform the analysis gas line test.
P F N/A
Make sure the helium gas line valves are in the correct state:
Gas bottle shut-off valve
Closed
.
Regulator shut-off valve fully
Open
.
Pressure control knob fully
Open
.
P F N/A
Perform the helium gas line test.
P F N/A