Gemini VII 2390 Confirm
Connecting Gases
Feb 09 Gemini VII 2390 Confirm Installation Instructions and Checklist
47
If
Failed
is shown, a leak is indicated between this connection. Check the connections
from the regulator shut-off valve to the gas bottle shut-off valve. Tighten as necessary,
then try the test again.
9.
Click the
Gas Pressure Test - 3
tab to display its report.
Passed
should display in the
Minimum
field, indicating that all valves are in the proper
state for operation.
If
Failed
is shown, one or more valves is not in the proper position; set the valves as
shown below and ensure the appropriate pressure is displayed on the low-pressure gauge.
If you wish to run the test again, be sure to close the gas bottle valve before starting the
test.
10. Click
Close
to close the test report.
11. Click
Close
on the test dialog to close the test.
Sample Port Pressure
Minimum: Passed
Actual = 759.09 mmHg
Fail if below = 700.00 mmHg
Pressure Control knob
OPEN
Gas Bottle Shut-Off valve
OPEN (CCW)
Regulator Shut-Off valve
OPEN (CCW)
Low-pressure gauge
14 - 15 psig
CCW = Counterclockwise