page 111
Z589
Round Baler
10-ET.6 PREPARING FOR WORK
10-ET.6.1 INSTALLING THE CORD
In order to install the wrapping cord correctly, read Chapter 7.6.1 "Installing the cord".
10-ET.6.2 INSTALLING THE NET
•
The baler can use net reels 2000 to 3000 m long.
•
The inner hole of the net reel cardboard core should be 75÷78 mm wide.
•
Use 14÷16 (g/m) rated nets to assure proper performance of the net wrapper.
Press
ON-OFF
to turn on the control system before attempting the procedures explained below.
When the
Home screen
is displayed, use
-
to select the
Motors
icon and confirm with
OK
.
•
Use
R
to select
NET wrapper
.
•
Use
+
to move the inner wrapper arm (towards the belts) until
STOP
is displayed.
•
Lift the guard panel
C
and place it on the support
S
.
•
Remove the tube
A
which is the net reel mount and remove the tube
T
to install the reel.
•
Put the net reel on the tube and secure the tube in the original position with the tube
A
.
•
Close the guard panel
C
.
IMPORTANT!
•
Place the net reel properly and carefully on the tube mount.
•
Keep the correct direction of rotation of the net reel, as shown on the relevant sticker.
Use
-
to move the net wrapper arm in the middle and install the net in the jaws.
Содержание Z589
Страница 126: ...page 123 Z589 Round Baler 11 6 BELT RUNNING Note The arrows show the direction of belt movement...
Страница 130: ...page 127 Z589 Round Baler...
Страница 143: ...page 140 Z589 Round Baler Notes...
Страница 144: ...page 141 Z589 Round Baler...