![Markes International UNITY-Air Server-xr Скачать руководство пользователя страница 27](http://html.mh-extra.com/html/markes-international/unity-air-server-xr/unity-air-server-xr_installation-manual_1727984027.webp)
QUI-1122
Page 27
Markes International Ltd
T:
+44 (0)1443 230935
F:
+44 (0)1443 231531
www.markes.com
3.8
Check for gas leaks
Once the transfer line, trap, split tube and Air Server-xr link tube have been installed, the carrier gas can
be switched on (0-60psi depending on the GC column installed). Check for any leaks using available total
flow readouts or/and by checking all connections with a helium detector.
Switch on the dry purge gas supply (recommended line pressure is 50-60psi). Check for any leaks by
switching off the supply at the U-GAS01 or step down regulator and checking that the pressure gauge
does not drop quickly.