![Markes International UNITY-Air Server-xr Скачать руководство пользователя страница 13](http://html.mh-extra.com/html/markes-international/unity-air-server-xr/unity-air-server-xr_installation-manual_1727984013.webp)
QUI-1122
Page 13
Markes International Ltd
T:
+44 (0)1443 230935
F:
+44 (0)1443 231531
www.markes.com
3.2.3
UNITY–Air Server-xr without Electronic Carrier Control (ECC) / T’d option
If ECC is not available / required then it is possible to reconfigure the UNITY–Air Server-xr with the
septum purge line removed.
The two gas lines (carrier and septum purge) from the ECC module on the GC should be connected
externally together via a 1/8” t-piece as shown below. The third arm of the t-piece should be connected
via 1/16” – 30/1000” i.d. stainless tubing to the ‘Carrier Inlet’ on the back of UNITY-xr.
NOTE
: If stainless steel tubing is unavailable, green PEEK tubing can be used in its place
In this alternate configuration there is less need to regulate the carrier gas supply to the EPC module as
close to the UNITY–Air Server-xr supply pressure in order to get stable behaviour.
Remove the right hand lower panel.
Disconnect the 1/16” t-piece shown.
Replace t-piece with a 1/16” union (SERZ-
0119), supplied in the shipping kit, connecting
the 2 vertical lines.
UNITY-xr
Pressure
Outlet
Carrier Inlet
GC
Carrier
Septum
Purge