![Markes International UNITY-Air Server-xr Скачать руководство пользователя страница 16](http://html.mh-extra.com/html/markes-international/unity-air-server-xr/unity-air-server-xr_installation-manual_1727984016.webp)
QUI-1122
Page 16
Markes International Ltd
T:
+44 (0)1443 230935
F:
+44 (0)1443 231531
www.markes.com
3.
When in operation the injector body should be heated, and should be set to run at a temperature
equal to the UNITY–Air Server-xr flow path temperature setting.
3.3.2
Installing the fused silica transfer line insert
Once the heated line has been fitted to the GC, the fused silica plus associated PTFE sleeving (
SERUTE-
5099
) (see shipping kit) are pushed from the GC end, along the 1/8-inch aluminium tube until they
protrude from the other (UNITY-xr) end of the transfer line.
Trim the PTFE sleeve to ensure enough fused silica is exposed.
Connect the fused silica transfer line to the GC column with a press-fit (
C-QSC10
) or alternative connector.
1. Push fused silica back into
sleeve
2. Cut away enough sleeve so that
~20cm fused silica is exposed at
either end
Nut
Washer
Injector Body
Washer
Transfer Line Heater