2.3 Post-Installation Checklist
After completing the installation, check the items in the following table to make sure
that the inverter has been safely and correctly installed.
Items
Details
Ref.
Result
Installation
Location/Power
I/O Verification
Is the installation location appropriate?
Does the environment meet the inverter’s
operating conditions?
Does the power source match the inverter’s rated
input?
Is the inverter’s rated output sufficient to supply
the equipment?
(Derating is applied in specific conditions. Refer to
11.8 Continuous Rated Current Derating
Power Terminal
Wiring
Is a circuit breaker installed on the input side of the
inverter?
Is the circuit breaker correctly rated?
Are the power source cables correctly connected
to the input terminals of the inverter?
(Caution: connecting the power source to the
U/V/W terminals may damage the inverter.)
Are the motor output cables connected in the
correct phase order?
(Caution: motors will rotate in reverse direction if
the three phase cables are not wired in the correct
rotation.)
Are the cables used in the power terminal
connections correctly rated?
Is the inverter grounded correctly?
Are the power terminal screws and the ground
terminal screws tightened to their specified
torques?
Are the overload protection circuits installed
correctly on the motors (if multiple motors are run
using one inverter)?
-
Is the inverter separated from the power source by
a magnetic contactor (if a braking resistor is in
use)?
Are advanced-phase capacitors, surge protection
and electromagnetic interference filters installed
correctly?
(These devices MUST not be installed on the
output side of the inverter.)
Содержание G100
Страница 14: ......
Страница 16: ...5 5 7 5 kW 3 Phase ...
Страница 32: ...0 4 0 8 kW 1 5 2 2 kW 4 0 kW ...
Страница 48: ......
Страница 68: ......
Страница 81: ......
Страница 100: ......
Страница 116: ...trips automatic Reset Restart is not attempted and the Fire Mode Count is not increased ...
Страница 118: ......
Страница 130: ... Terminal connections for 3 wire operation 3 wire operation ...
Страница 140: ... PID control block diagram ...
Страница 165: ...Code and Features Description Code Description continuous rating ...
Страница 170: ......
Страница 186: ... Displayed as on the Keypad ...
Страница 200: ...provided signal output at 150 36 sec ...
Страница 216: ...Code and Features Description delay time delay time ...
Страница 219: ......
Страница 237: ......
Страница 253: ......
Страница 295: ......
Страница 314: ......
Страница 330: ...11 10 Remote Keypad Option It is comprised of a remote keypad and cables 1 m 2 m 3 m and 5 m Units mm ...
Страница 335: ...Manual Revision History Revision History No Date Edition Changes 1 2019 01 First Release ...