![LSIS G100 Скачать руководство пользователя страница 13](http://html.mh-extra.com/html/lsis/g100/g100_operation-manual_1944296013.webp)
1 Preparing the Installation
This chapter provides details on product identification, part names, correct installation
and cable specifications. To install the inverter correctly and safely, carefully read and
follow the instructions.
1.1 Product Identification
The G100 Inverter is manufactured in a range of product groups based on drive
capacity and power source specifications. Product name and specifications are
detailed on the rating plate. Check the product specification before installing the
product and make sure that it is suitable for the intended use. For more detailed
product specifications, refer to
input and Output Specification
Note
Open the packaging, and check the product name first and whether that the product is
free from defects. If the product is found to be faulty, contact your supplier.
Содержание G100
Страница 14: ......
Страница 16: ...5 5 7 5 kW 3 Phase ...
Страница 32: ...0 4 0 8 kW 1 5 2 2 kW 4 0 kW ...
Страница 48: ......
Страница 68: ......
Страница 81: ......
Страница 100: ......
Страница 116: ...trips automatic Reset Restart is not attempted and the Fire Mode Count is not increased ...
Страница 118: ......
Страница 130: ... Terminal connections for 3 wire operation 3 wire operation ...
Страница 140: ... PID control block diagram ...
Страница 165: ...Code and Features Description Code Description continuous rating ...
Страница 170: ......
Страница 186: ... Displayed as on the Keypad ...
Страница 200: ...provided signal output at 150 36 sec ...
Страница 216: ...Code and Features Description delay time delay time ...
Страница 219: ......
Страница 237: ......
Страница 253: ......
Страница 295: ......
Страница 314: ......
Страница 330: ...11 10 Remote Keypad Option It is comprised of a remote keypad and cables 1 m 2 m 3 m and 5 m Units mm ...
Страница 335: ...Manual Revision History Revision History No Date Edition Changes 1 2019 01 First Release ...