Fasten the screws on the right side of the Home 8. (25 kgf·cm (22 lbf·in) torque, Hex socket
: M8)
The main circuit breaker for the SE Box should be installed in the SE Box or upstream of the SE
Box.
INFO
H
Switch the main circuit breaker for the SE Box to the ON position and wait until the main
screen appears on the HMI display. It will take about 30 seconds.
I
Switch the circuit breaker for the Home 8 to the ON position.
J
Switch the circuit breaker for the PV inverter to the ON position (if equipped).
K
Press the POWER button and press and hold the BLACK START (6s) button for at least 6
seconds until you hear a "click."
If the SoC level is shown on the LED display of the Home 8, the booting process has been