Installation
68
Due to our policy of continuous product innovation, some specifications may change without notice.
©LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. “LG” is a registered trademark of LG Corp.
Installation Completion
a
Before closing any installed hardware, take photos of the completed wiring in the SE Box,
Home 8, and main panel.
b
Make sure that all conduit junctions and cable entry points are secure and properly sealed.
c
Arrange the communication and AC power wires neatly inside the Home 8 wiring
compartment.
D
Install the SE Box safety cover and secure it firmly with the original screws.
Before attaching the safety cover to the SE Box, remove the panels on the circuit breaker
installed positions. When removing the panels, make sure the burr parts in each panel hole
are cleanly removed.
The labels and markings must comply with the NEC and local code. The corresponding labels
must be attached after the installation inspection has been approved by AHJ.
CAUTION
E
Attach naming labels to distinguish the breakers.