Installation
52
Due to our policy of continuous product innovation, some specifications may change without notice.
©LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. “LG” is a registered trademark of LG Corp.
L
At the end of the 6-conductor communication cable on the SE Box side, insert the wires
into the 6-position connectors as shown in the figure.
Fix the cable in the upper hook as shown in the figure. Arrange the cable between the
plastic case and metal enclosure.
Cut back the drain wire and shield. The drain wire should be terminated at the Home 8
chassis ground terminal only.
1. CAN HI (Orange-White)
2. CAN LOW (Orange)
3. 12V (Green-White)
4. RELAY CHECK (Green)
5. GRID CHECK (Blue-White)
6. GND (Blue)
(CN1000)