25
W
a
ter Piping System Installation
'XHWRRXUSROLF\RIFRQWLQXRXVSURGXFWLQQRYDWLRQVRPHVSHFL¿FDWLRQVPD\FKDQJHZLWKRXWQRWL¿FDWLRQ
/*(OHFWURQLFV86$,QF(QJOHZRRG&OLIIV1-$OOULJKWVUHVHUYHG³/*´LVDUHJLVWHUHGWUDGHPDUNRI/*&RUS
P2
T2
P1
T1
LG Supplied
P2
T2
P1
T1
LG Supplied
Leaving Cold Water
Entering Water
Installation Method B
Independent product installation.
Figure 19: Installation Method B.
Symbol
Description
Symbol
Description (Provided by Others)
Valve (100% Flow)
T1 or T2
Temperature Sensor (1: Inlet, 2: Outlet)
Strainer (50 Mesh)
P1 or P2
* Pressure Gauge (1: Inlet, 2: Outlet)
Flexible Joint
Cold Water Pump (Pump Sized to Meet Minimum to
Maximum Flow for LG Chiller)
Service Port for Cleaning
Optional
*
*
*
*
* Required
:$7(53,3(6<67(03,3,1*