Note:
Disengage all latches, release tabs, or locks on cable connectors when you disconnect cables. Failing
to release them before removing the cables will damage the cable connectors or the cable sockets on circuit
boards, which are fragile. Any damage to the cable connectors or cable sockets might require replacing the
cables or circuit boards.
Some options, such as RAID controllers, might require additional internal cabling. See the documentation
that is provided for the option to determine any additional cabling requirements and instructions.
Cable guides
Make sure that all the cables go through the cable guides, as shown in each cabling section.
Figure 29. Cable guide locations
Connecting cables
To connect cables, observe the following guidelines:
• Disconnect all power cords from the server before you connect or disconnect any internal cables.
• See the documentation that comes with any external devices for additional cabling instructions. It might
be easier for you to route cables before you connect the devices to the server.
.
41
Содержание ThinkAgile VX 4-Socket 4U Certified Node
Страница 6: ...iv User Guide for ThinkAgile VX7820 Appliance ThinkAgile VX 4 Socket 4U Certified Node ...
Страница 10: ...viii User Guide for ThinkAgile VX7820 Appliance ThinkAgile VX 4 Socket 4U Certified Node ...
Страница 69: ...Chapter 2 Server components 59 ...
Страница 76: ...66 User Guide for ThinkAgile VX7820 Appliance ThinkAgile VX 4 Socket 4U Certified Node ...
Страница 96: ...86 User Guide for ThinkAgile VX7820 Appliance ThinkAgile VX 4 Socket 4U Certified Node ...
Страница 252: ...242 User Guide for ThinkAgile VX7820 Appliance ThinkAgile VX 4 Socket 4U Certified Node ...
Страница 276: ...266 User Guide for ThinkAgile VX7820 Appliance ThinkAgile VX 4 Socket 4U Certified Node ...
Страница 284: ...274 User Guide for ThinkAgile VX7820 Appliance ThinkAgile VX 4 Socket 4U Certified Node ...
Страница 295: ......
Страница 296: ......