Figure 84. Hot-swap drive filler removal
Step 1. Press the release tab and pull the filler from the bay.
Install fillers in all empty drive bays. If you remove a four-bay filler, the vacant drive bays must be filled with a
four-bay filler, hot-swap drives, or single-bay fillers.
Install a hot-swap drive filler
Insert the hot-swap drive filler in the bay and press it in place. Hot-swap drive fillers can be of two types:
single-bay fillers and four-bay fillers.
Complete the following steps to install a hot-swap drive filler:
Watch the procedure
. A video of the installation process is available:
•
•
.
Hardware replacement procedures
151
Содержание ThinkAgile VX 4-Socket 4U Certified Node
Страница 6: ...iv User Guide for ThinkAgile VX7820 Appliance ThinkAgile VX 4 Socket 4U Certified Node ...
Страница 10: ...viii User Guide for ThinkAgile VX7820 Appliance ThinkAgile VX 4 Socket 4U Certified Node ...
Страница 69: ...Chapter 2 Server components 59 ...
Страница 76: ...66 User Guide for ThinkAgile VX7820 Appliance ThinkAgile VX 4 Socket 4U Certified Node ...
Страница 96: ...86 User Guide for ThinkAgile VX7820 Appliance ThinkAgile VX 4 Socket 4U Certified Node ...
Страница 252: ...242 User Guide for ThinkAgile VX7820 Appliance ThinkAgile VX 4 Socket 4U Certified Node ...
Страница 276: ...266 User Guide for ThinkAgile VX7820 Appliance ThinkAgile VX 4 Socket 4U Certified Node ...
Страница 284: ...274 User Guide for ThinkAgile VX7820 Appliance ThinkAgile VX 4 Socket 4U Certified Node ...
Страница 295: ......
Страница 296: ......