131
9
Appendix
9.28
Declaration of Conformity
Month/Year:
:.............................April../...10...............................
Manufacturer:
LAMTEC Meß- and Regeltechnik
für Feuerungen GmbH & Co KG
..............................................................................
Address:
Wiesenstraße 6, D-69160 Walldorf
..............................................................................
Product:
ETAMATIC / ETAMATIC S
...............................................................................
Type approval:
CE 0085 AU 0207
................................................................................
The indicated product comply with the regulations of following European Guidelines:
Number
Title
2004/108/EC Electromagnetic compatibility
2006/95/EC
Low voltage directrive
2009/142/EC Gas Device Guideline
Further information on observance of these guidelines includes the appendix
Fixing the CE-Label:
no, it’s a component
Location, day:
Walldorf, April 20
th
, 2010
Legally signature:
The appendix is part of this declaration.
This declaration certifies the observance with the named guidelines, does not include any assurance of characteristics.
Pay attention strictly for the safety instructions of the delivered product documentation.
Содержание ETAMATIC
Страница 1: ...Manual ETAMATIC ETAMATIC S CE 0085 AU 0207 Sensors and Systems for Combustion Engineering...
Страница 2: ......
Страница 7: ...6 Table of Contents 9 27 Dimensions and weight 128 9 28 Declaration of Conformity 131...
Страница 65: ...64 8 Control Mode 8 2 1 Leakage test flow chart Fig 8 4 Flow chart leakage test...
Страница 69: ...68 8 Control Mode Switching in standby via LSB module Fig 8 7 Switching in Standby mode via LSB module...
Страница 90: ...89 9 Appendix 9 8 Process Sequence Charts Fig 9 3 Process sequence chart gas with pilot burner...
Страница 91: ...90 9 Appendix Fig 9 4 Process sequence chart oil with pilot burner...
Страница 92: ...91 9 Appendix Fig 9 5 Process sequence chart gas without pilot burner...
Страница 93: ...92 9 Appendix Fig 9 6 Process sequence chart oil without pilot burner...
Страница 98: ...97 9 Appendix 9 9 Connection Diagrams Fig 9 7 ETAMATIC wiring diagram with ignition flame monitoring...
Страница 99: ...98 9 Appendix Fig 9 8 ETAMATIC S wiring diagram with ignition flame monitoring...
Страница 104: ...103 9 Appendix Fig 9 16 LSB connection ETAMATIC LT1 other LAMTEC devices...
Страница 134: ...133 9 Appendix...
Страница 135: ......