Appendix
9.7
Tips and Tricks
Oil pressure does not build up in time.
Extending the transformer pre-energise time (P 782) starts the pump sooner.
9.7.1
Set pilot burner
Setting the "Service mode" parameter (P 787) causes the ETAMATIC operating program to
run only up to the stabilisation time. But up to 5 successive starts can be attempted without
pre-ventilation and without leakage test. After setting the pilot burner, set parameter back to 0
NOTICE!
Resetting a fault with a total reset clears the internal counter for the service mode. The next
start-up, pre-ventilation again.
9.7.2
Post-measurement of safety times
If it is required to measure the installation's safety times at a later time (e.g. as part of an in-
stallation's acceptance tests), it is not sufficient to disconnect the magnetic valves before start-
up. This is recognised by the ETAMATIC's self-testing circuit, and results in emergency shut-
down.
Disconnect the ignition position's acknowledgement function (term. 46). Start-up and wait until
the ignition position is reached. On the self-test's completion (ca. 5 sec), the magnetic valve
can be disconnected. Reconnect the ignition position acknowledgement function.
The installation starts up.
Содержание ETAMATIC
Страница 1: ...Manual ETAMATIC ETAMATIC S CE 0085 AU 0207 Sensors and Systems for Combustion Engineering...
Страница 2: ......
Страница 7: ...6 Table of Contents 9 27 Dimensions and weight 128 9 28 Declaration of Conformity 131...
Страница 65: ...64 8 Control Mode 8 2 1 Leakage test flow chart Fig 8 4 Flow chart leakage test...
Страница 69: ...68 8 Control Mode Switching in standby via LSB module Fig 8 7 Switching in Standby mode via LSB module...
Страница 90: ...89 9 Appendix 9 8 Process Sequence Charts Fig 9 3 Process sequence chart gas with pilot burner...
Страница 91: ...90 9 Appendix Fig 9 4 Process sequence chart oil with pilot burner...
Страница 92: ...91 9 Appendix Fig 9 5 Process sequence chart gas without pilot burner...
Страница 93: ...92 9 Appendix Fig 9 6 Process sequence chart oil without pilot burner...
Страница 98: ...97 9 Appendix 9 9 Connection Diagrams Fig 9 7 ETAMATIC wiring diagram with ignition flame monitoring...
Страница 99: ...98 9 Appendix Fig 9 8 ETAMATIC S wiring diagram with ignition flame monitoring...
Страница 104: ...103 9 Appendix Fig 9 16 LSB connection ETAMATIC LT1 other LAMTEC devices...
Страница 134: ...133 9 Appendix...
Страница 135: ......