126
CHAPTER 5:
Advanced Operation
Model CRX-6.5K Probe Station
The four M4 screws holding the bellows flange to the z-axis stage assembly should be
installed to a torque of 112 N mm (16 in ounces). The torque required is much lower than
one might think would be needed. We recommend using a torque wrench to ensure these
screws are not over-torqued. If these screws are over-torqued, the z-axis stage and bel-
lows may be damaged.
FIGURE 5-29
Left: Thread the nut onto the bottom of the shaft; Right: Tighten the four long horizontal M4 screws
Содержание CRX-6.5K
Страница 4: ...Model CRX 6 5K Probe Station ...
Страница 52: ...42 CHAPTER 2 System Overview Model CRX 6 5K Probe Station ...
Страница 92: ...82 CHAPTER 3 Installation and Setup Model CRX 6 5K Probe Station ...
Страница 162: ...152 CHAPTER 6 Maintenance and Troubleshooting Model CRX 6 5K Probe Station ...
Страница 166: ...156 INDEX Model CRX 6 5K Probe Station ...