53
|
www.lakeshore.com
e.
Using a level, adjust the four feet of the probe station stand until the probe
station table top is level.
f.
Using a ¾ in or adjustable wrench, lock the vibration dampening feet locking
nuts up against the bottom of the probe station stand (FIGURE 3-8).
11. Leave the inner CCR stand locked to the probe station stand. The CCR stand will
be set in section 3.6.1 as it requires some items found in the tool and accessories
kits.
3.3.6 Unpacking the
Probe Station
You will need to unpack the probe station itself, including removing any ties and
packing paper.
1. Using wire cutters, cut the plastic ties from the x-axis hand dials. Remove the
tape (if any) from the z-axis micrometers.
2. Remove any dust caps located on the probe arm electrical feedthroughs.
3.3.7 Unpacking
the Equipment
Depending on your options, other items may be shipped, including the temperature
controller, vision system, turbo pumping system and the accessories box.
3.3.7.1 Unpacking the Model 336 Temperature Controller
The Model 336 temperature controller provides the temperature monitoring and
control for the Model CRX-6.5K. To unpack the controller, remove the packaging and
prepare the cables for routing. Refer to the Model 336 user’s manual if you need
further information.
3.3.7.2 Unpacking the Vision System
The vision system is packed in its own box within the crate. The microscope
components are packed in bubble wrap and boxes. The display is packed in its original
packaging. A separate box contains much of the rest of the optics: the light source,
microscope, CCD camera and power supply, microscope vertical post and horizontal
boom and miscellaneous support items. Unpack these components and set them out
in preparation for completing the system setup and assembly.
3.3.7.3 Unpacking the Tool Kit and Spares Kit
The tool kit and the spares kit come wrapped in plastic bags in the accessories box. In
each kit is a form that lists the included components, part numbers and their use on
the probe station. Retain these forms for reference or for use when ordering
additional items. The hex keys and lifter tool are needed during assembly and
operation. The 7 mm wrench, hardware and o-rings are used for maintenance or
configuration changes.
FIGURE 3-8
Locking the vibration dampening feet locking nut
Содержание CRX-6.5K
Страница 4: ...Model CRX 6 5K Probe Station ...
Страница 52: ...42 CHAPTER 2 System Overview Model CRX 6 5K Probe Station ...
Страница 92: ...82 CHAPTER 3 Installation and Setup Model CRX 6 5K Probe Station ...
Страница 162: ...152 CHAPTER 6 Maintenance and Troubleshooting Model CRX 6 5K Probe Station ...
Страница 166: ...156 INDEX Model CRX 6 5K Probe Station ...