154
INDEX
Model CRX-6.5K Probe Station
Model 336
verifying
verifying voltages
N
noise
electrical
low noise measurements
reducing 50-60 Hz
reducing 50-60 Hz noise
O
operation
advanced
chamber lid removal
closing the vacuum cham-
ber and radiation shield
evacuating the vacuum
chamber
imaging and probing the
sample
landing the probe
mounting samples
mounting the sample holder
87
planarization assembly
probe arm translation stag-
es
reducing condensation
removing the sample holder
84
sample alignment
sample exchange
temperature
temperature control
temperature controls
turbo pump
turbo pump shut down
vacuum
vacuum chamber purge
optical fiber
installing
removing
o-rings
maintenance
P
pin outs
planarization assembly
installation
use
power requirements
1-phase
probable area
probe arm
assemblies
installing
maintenance
removing
probe station
applications
assembly
components
description
elevation requirements
environmental require-
ments
floor plan
installation
operation
power requirements
site requirements
specifications
subsystems
unpacking
probe tips
probes
installing a ZN50
landing
misaligned
pitch
removing
removing a ZN50
troubleshooting
probing configurations
purge
heated cycle purge
R
radiation shield lid removal
RF measurements
S
sample
imaging and probing
low resistance
permanent mounting
semi-permanent mounting
86
temporary mounting
sample cooling assembly
cooling curve
cryopump
electronic controls
image
troubleshooting
vacuum controls
sample exchange
sample holder
alignment of sample
cleaning
coaxial
device characterization
grounded
isolated
isolated ground
mounting samples
probable area
removing
samples with conductive
back side features
voltage biasing
service reference
shielding
DC/RF measurements
vacuum chamber
space requirements
specifications
T
temperature
instrumentation
specifications
temperature control summary
testing the system
microscope
probe arm reach
probe continuity
sensor and heater
triaxial sample holder
troubleshooting
image system
probe station cooling
probes
turbo pumping system
basic operation
components
power requirements
U
unpacking
crates
moving and lifting the probe
station
options
tools required
Содержание CRX-6.5K
Страница 4: ...Model CRX 6 5K Probe Station ...
Страница 52: ...42 CHAPTER 2 System Overview Model CRX 6 5K Probe Station ...
Страница 92: ...82 CHAPTER 3 Installation and Setup Model CRX 6 5K Probe Station ...
Страница 162: ...152 CHAPTER 6 Maintenance and Troubleshooting Model CRX 6 5K Probe Station ...
Страница 166: ...156 INDEX Model CRX 6 5K Probe Station ...