SUPERSTRUCTURE OPERATION
Operating instructions • Load Carrier • 505410638-02 • 07/2019
75
○
several sets of lath sockets for plug-in
laths, and
○
one set of lath sockets above the floor,
each for four plug-in laths.
Posts without lath sockets are also pos-
sible.
1
2
3
4
5
6
Fig. 6-31:
Telescopic fold-out post
1
Plugging unit
2
Flat lath sockets
3
Lock
4
Locking lever
5
Lath depot
6
Post pockets
1
2
3
4
5
6
Fig. 6-32:
Optional design of the centre post
1
Plugging unit
2
Flat lath sockets
3
Lock
4
Locking lever
5
Lath depot
6
Post pockets
Opening the telescopic fold-out posts
þ
The posts are ready to be moved
► Press in the locks on the locking lever.
► Pull out the locking lever from the post
profile.
Fig. 6-33:
Folding down the locking lever
► Completely fold down the locking lever
until the post retainer is released from
the chassis and the post slides down
from the post pocket.
Fig. 6-34:
Swivelling the post away from the
vehicle
► Swivel the posts away from the
vehicle.