1.
The previously set reactive power characteristic curve is displayed
graphically (example in Fig. left).
2.
Press
ESC
✓
The check list is shown.
Finish
has been selected in the check list and
SET
has been pressed.
One of 2 possible dialogues is displayed.
1.
Proceed as follows, depending on the respective dialogue:
n
Dialogue
Settings are incomplete
: Press
SET
and work
through the open items in the check list.
n
Dialogue
Are all settings correct?
:
Press
ESC
to correct settings or
2.
Press and hold
SET
(> 1 s) to finish 1st commissioning.
✓
If
SET
was pressed for a longer time then the inverter starts anew
and synchronises itself with the grid (Fig. left).
You have completed the initial commissioning of the inverter.
4.8 Feed-in management
Depending on the country, photovoltaic systems must have the possibility
of being reduced in the fed-in effective power by the network operator. The
following products are recommended for implementing this legally pre‐
scribed specification:
n
Energy meters (B+G SDM630, Herholdt ECS3-80B, Carlo Gavazzi
EM24-DI, Janitza ECS3)
n
WEB'log from Meteocontrol
n
Solar-Log from Solare Datensysteme
n
Energy-Manager from Kiwigrid
The energy meter for the feed-in management is connected to the Modbus
RTU interface (RJ10) and must meet the preconditions described in
Chapter 3.6.7 „Modbus RTU“ on page 28
„Modbus RTU data connection cable“ on page 28
NOTICE!
The settings for feed-in management must be made in the
sub-menu
„Energy management“
.
Display char. curve
Finishing initial commis‐
sioning
Installation
11/2017 | DOC01664604 | KOSTAL operating instructions PIKO inverter 1.5 - 4.2 MP
43
Содержание PIKO 1.5 MP
Страница 1: ...PIKO 1 5 4 2 MP Operating instructions...
Страница 77: ...Appendix Appendix 11 2017 DOC01664604 KOSTAL operating instructions PIKO inverter 1 5 4 2 MP 77...
Страница 79: ......