6. Periodical check
Field Service Ver. 2.0 Mar. 2006
34
bizhub C250P
Maintenance
B. Reinstallation Procedure
1.
Insert the Transfer Belt Unit [1].
NOTE
• Insert the Transfer Belt Unit with
care not to allow its docking gear to
be damaged by hitting it against the
rail or associated part.
• Do not touch the surface of the
Image Transfer Belt Unit.
• Cover the Image Transfer Belt Unit
with something such shade cloth to
protect its surface from dust or for-
eign matter.
2.
Install the Image Transfer Belt Unit
with two Screws [2].
NOTE
• Replace the 2nd Image Transfer
Roller, the Ozone Filter and the
Dust Filter/Vertical Conveyance,
which are supplied with the Image
Transfer Belt Unit, at the same time.
3.
Close the Right Door.
4.
Reinstall the Imaging Unit and the
Waste Toner Box.
5.
Turn ON the Main Power Switch.
6.
Select [Service Mode]
→
[Imaging
Process Adjustment]
→
[X-Rite Cali-
bration (Gradation Adjust)] of the Jig
software and carry out Gradation
Adjust.
6.6.3
Cleaning of the Image Transfer Entrance Guide
1.
Remove the Image Transfer Belt.
See P.32
2.
Wipe the Image Transfer Entrance
Guide [1] clean of spilled toner and
dirt using a soft cloth dampened with
water or alcohol.
[1]
4038F2C026DA
[2]
4038F2C027DA
1
4038F2C607DA
[1]
bizhub_C250P_Total.book 34 ページ 2006年3月27日 月曜日 午前8時28分
Содержание BIZHUB C250P
Страница 1: ...SERVICE MANUAL FIELD SERVICE...
Страница 3: ...ii Blank Page...
Страница 26: ...SERVICE MANUAL 2006 03 Ver 2 0 FIELD SERVICE Main Unit...
Страница 49: ...4 Paper path Field Service Ver 2 0 Mar 2006 8 bizhub C250P General 4 Paper path 4038F1C404AA...
Страница 329: ...21 Mechanical adjustment Field Service Ver 2 0 Mar 2006 288 bizhub C250P Adjustment Setting Blank Page...
Страница 415: ...26 Controller trouble Field Service Ver 2 0 Mar 2006 374 bizhub C250P Troubleshooting Blank Page...
Страница 422: ......