Field Service Ver. 2.0 Mar. 2006
11. Other
129
bizhub C250P
Maintenance
11.4.8
Tray 2 Separation Roller
1.
Slide out the Tray 2.
2.
Open the Vertical transport door.
3.
Remove two Claws [1], and remove
the Vertical transport door [2].
4.
Remove two Screws [3], and remove
the Jam processing cover [4].
NOTE
• Make sure the position of the Mylar
when installing the Jam processing
cover.
5.
Remove two Screws [5] and the Tray
2 Separation Roller installation plate
Assy [6].
[1]
[2]
4038F2C011DA
[3]
[3]
[4]
4038F2C012DB
OK
NG
[5]
[6]
4038F2C013DA
bizhub_C250P_Total.book 129 ページ 2006年3月27日 月曜日 午前8時28分
Содержание BIZHUB C250P
Страница 1: ...SERVICE MANUAL FIELD SERVICE...
Страница 3: ...ii Blank Page...
Страница 26: ...SERVICE MANUAL 2006 03 Ver 2 0 FIELD SERVICE Main Unit...
Страница 49: ...4 Paper path Field Service Ver 2 0 Mar 2006 8 bizhub C250P General 4 Paper path 4038F1C404AA...
Страница 329: ...21 Mechanical adjustment Field Service Ver 2 0 Mar 2006 288 bizhub C250P Adjustment Setting Blank Page...
Страница 415: ...26 Controller trouble Field Service Ver 2 0 Mar 2006 374 bizhub C250P Troubleshooting Blank Page...
Страница 422: ......